Ahwaz Sewer Pipe Line Project

c82cc4e14a1d2c8c8ffff9840d24b558 L

 

 

 

Project: Ahwaz Sewer Pipe Line Project

Employer: Ahvaz' water and wastewater company

Contract: PC

 

Start and finish date:   2011-8-13 until 2013-2-10

 

 

:Discipline

Civil
 

:Main Items Of Work

•   Pipe laying with circular reinforced concrete               1,130 m

     circular reinforced concrete

     piping of 1200 mm diameter

•   Pipe laying with                                                       575 m

     circular reinforced concrete

     piping of 800 mm diameter

•   Manhole construction                                               20 units

 

 

 

 

c9b002fe1bb0320831a8ae78670fdb6f XL

 

 

Project: Complete rehabilitation and revamping of IrankhodroSaze Company (Peikanshahr)

 

Employer: Irankhodrosazeh Company

Contract: PC

Start and finish date: 2008-4-20 until 2008-7-20

Discipline

• Civil
• Mechanical
• Electrical
 

Highlights

Complete rehabilitation and revamping of a 4 story building to transform an old residential building to office. Including the complete removal of partition and loading bearing walls to create a completely open office area, including of mechanical and electrical rooms of facility together with complete smoke/fire

.detection system

 

Items of works

All of the steel works                   100 ton

 

Picture7

 

 

Project: Double Span Bridge Construction in Tehran- Shomal Highway

Employer: Tehran-Shomal highway company

Contract: PC

Start and finish date: 2007-5-27 until 2008-11-27

Discipline:

  • Civil
  • Mechanical
  • Electrical

Highlights:

The Bridge consisted of plate girder on each side, 100,000 kg girders. The bridge was constructed using strand jacks. The jacks were arranged in a "pull-push" configuration enabling accurate and thorough control throughout the installation of the main elements (girders).

Items of works:

 

Earth works

45,000 m3

Earth fill works

250,000m3

Reinforcement

450,000 kg

Concreting

4,000m3

Steel structures